搜索结果: 1-1 共查到“凹凸棒石 Highway Tunnel”相关记录1条 . 查询时间(0.031 秒)
Stability Analysis of Highway Tunnel Portal Slope in Shiyan Area
Highway Tunnel Landslide Mechanism Shiyan Area Stability Analysis
2011/12/20
Under the control of the tow-Yun fracture, the geological conditions are complicated and the rock strata is broken in Shiyan area ,in the northwest of Hubei province, and the rock mass is weathered in...