搜索结果: 1-1 共查到“石油与天然气工程 Operating Procedures”相关记录1条 . 查询时间(0.054 秒)
Using Horizontal Wells to Sequester CO2 and Enhance Coalbed Methane Recovery: A Simulation Study of Operating Procedures
Enhance Coalbed Methane Recovery Operating Procedures
2008/10/27
Because of increased concern about anthropogenic carbon dioxide emissions, a pilot project is being implemented in northwest West Virginia to study the technical feasibility of carbon dioxide sequestr...