搜索结果: 1-1 共查到“石油、天然气地质与勘探 workover”相关记录1条 . 查询时间(0.078 秒)
Thru-tubing workover operations in Yufutsu gas field∼Akebono area
thru-tubing coiled tubing work tubing continuous overshot wireline chemical cutter
2009/5/8
Japex did the workover operations in Yufutsu gas field, Hokkaido in 2004. It was an unique and challenging workover operations. The well had been suspended because more than 3,500m of 1.25in coiled t...