搜索结果: 1-8 共查到“核科学技术 performance”相关记录8条 . 查询时间(0.125 秒)
Performance simulation of a MRPC-based PET Imaging System
Performance simulation MRPC-based PET Imaging System
2011/7/21
The low cost and high resolution gas-based Multi-gap Resistive Plate Chamber (MRPC) opens a new possibility to find an efficient alternative detector for Time of Flight (TOF) based Positron Emission T...
Performance of a large TeO2 crystal as a cryogenic bolometer in searching for neutrinoless double beta decay
large TeO2 crystal cryogenic bolometer cryogenic bolometer neutrinoless double beta decay
2011/7/20
Bolometers are ideal devices in the search for neutrinoless Double Beta Decay. Enlarging the mass of individual detectors would simplify the construction of a large experiment, but would also decrease...
Theoretical and Numerical Study of Heat Transfer Deterioration in High Performance Light Water Reactor
Theoretical Numerical Study High Performance Light Water Reactor
2009/9/3
A numerical investigation of the heat transfer deterioration (HTD) phenomena is performed using the low-Re k-ω turbulence model. Steady-state Reynolds-averaged Navier-Stokes equations are solved toget...
核电站常规岛采购模式与机组性能保证问题 (The Issues on the Procurement Pattern and the Performance Guarantee of NPP Conventional Island )
采购模式 性能保证
2008/10/8
着重论述核电站常规岛设备采购模式与汽轮发电机组热力性能保证值的关系,介绍了不同采购模式下汽轮发电机组性能保证条件、考核试验方法、采购包划分与技术谈判中须考虑的问题。
在持续提升核电安全性方面的基本考虑(Considerations on Continuous Enhancement of Safety Performance of Nuclear Power Plant )
核电 安全性 经济性
2008/9/12
安全第一、质量第一始终是中国广东核电集团有限公司发展核电的基本方针。在电力市场竞争的条件下,经济性是不容忽视的重要因素,而高的安全性正是经济性的重要前提。为了提高已投运、在建和拟建核电站的安全性和经济竞争力,中国广东核电集团有限公司始终坚持在设计阶段选用成熟而先进的技术,努力向未来用户需求的安全标准靠拢,在建设阶段努力抓好技术、安全、质量、工期、投资五大控制,特别是质量控制,在生产阶段则努力营造安...
nuclear regulatory commission to Discuss 2006 Performance Assessment for Palisades Nuclear Power Plant
Nuclear
2007/4/11
nuclear regulatory commission to Meet with U.S. Enrichment Corporation to Discuss Performance at Paducah Gaseous Diffusion Plant
safety Radiological Controls
2007/1/22